Key activities during the engineering phase are:
Well engineering/design/risk analysis and feasibility options
Integration with other disciplines to develop a robust design/program
Mud system design and specification including environmental considerations
Optimized casing scheme design and specification
Directional drilling design and specification
Data acquisition and evaluation planning
Pore pressure prediction and management (optional)
Design of testing and completion
Rig selection and specification
Cost and schedule estimates for both individual wells and programs